News & insights
The Constructivist Episode 7: Maren Kern on why housing policy has to look ten years ahead
16 Sept 2026, by All3
What happens when the cause of a housing shortage and its consequences are separated by a decade?
In 2010, Berlin still had as many as 180,000 empty flats. Maren Kern called for new housing to be built anyway - vacancy had dropped below the level at which a rental market can function - and, she says, was dismissed as mad. Fifteen years on, the cost of that delay is visible across the city.
In episode 7 of The Constructivist, Wulf von Borzyskowski speaks with Kern, Member of the Executive Board of the BBU (Verband Berlin-Brandenburgischer Wohnungsunternehmen), about the long lead times of housing, the limits of regulation, and how innovation moves from isolated pilot projects into the standard way of building.
Complexity is a recurring theme. Before the turn of the millennium, Germany had around 5,000 building regulations; today there are well over 20,000. Kern describes a system trying to regulate every individual case, while projects grow slower, more expensive and harder to deliver.
The conversation is not only about what blocks housing. Kern also discusses timber construction, digital planning and automation, and the need to bring these into everyday practice faster. If housing has a lead time of five to ten years, she argues, the industry cannot wait for a crisis to become visible before it changes how it builds.
Maren Kern has sat on the Executive Board of the BBU since 1 August 2009. The association represents housing companies across Berlin and Brandenburg, covering around 1.1 million homes. Kern studied law and architecture, practised as a lawyer, and served as the BBU's legal counsel before leading its subsidiary Domus Consult.
Watch the full episode here:
Subscribe to The Constructivist on YouTube for new episodes.
The Constructivist Episode 8: George Salden on why we manufacture almost everything, but still build homes by hand
30 Sept 2026, by All3
Video: George Salden joins Wulf von Borzyskowski to discuss industrialised housebuilding, digital permits and connected buildings.
Read moreEurope Is About to Rebuild Itself. The Question Is Whether It Rebuilds Well.
23 Sept 2026, by Rodion Shishkov
Insight: All3 co-founder and CEO Rodion Shishkov explains why rebuilding Europe's post-war housing now rivals refurbishment on cost and carbon, and how cheaper construction will tip the balance.
Read moreWaVe-X invests in All3, accelerating automated timber construction with robotics and AI
03 Sept 2026, by All3
Press release: WaVe-X, the venture arm of Austrian industrial group WALTER GROUP, has invested in All3, backing its European expansion as the company moves from test building to first customer project.
Read more